The support structure needs to be substituted whilst standing upright and in sections. This presents several problems as neither the weight, nor its exact distribution or statics are fully known or calculable.
It is necessary to pay attention to an even weight distribution during disassembly in order not to damage the bronze by bending or tearing it.
In order to protect the monument’s previously restored front side from rust chips and sparks originating in the grinding process, tightly fitting welding blankets and plastic tarpaulins are applied.
In a first step, some measures have to be undertaken to provide some load relief within certain parts of the support structure: hardwood wedges are inserted on the front of the monument whilst jacking up the middle section, which presumably carries most of the weight. The substitution work begins with the right section, followed by the right supporting elements and the lower middle section, then followed by the left side and its supporting elements, and so forth. As an example here we show the substitution of the right section and pilaster.
The individual part is disassembled by use of rotary cutting tools and is entirely disconnected from all bronze parts.
The pilaster is screwed on to the plate and any gaps are filled in with steel.
The screws needed in the lower mid section of the bronze and to connect the frame are outfitted with brass washers which carry the bulk of the load.
Still outstanding measures to conserve the bronze back side include substituting the corroded screws, respectively the conservation of their surfaces and the application of a protective coating against the elements and pollutants.
Auguste Rodin
Occasion for the Restoration
Restoration Concept
Stage 1
The placement of the support construction
The mounting of the support construction
Securing the support construction to the Gate
Drilling of the base
Cutting of the base and lifting
Movement of the structure by means of chain hoists
View of the back of the monument
Stage 2
Cleaning and conservation of the front of the Gate
Initial tests
Methodologies for the exposure of the metal
Stabilization with Incralac®
Touch-ups
Protective layer
The «Battista» Example
Stage 3
Measures undertaken on the back side
The support structure
The substitution of the lower support structure and frame
Transportation
The building of the transportation frame
Moving The Gates of Hell on to a low bed trailer